
Ultima on Wharf is a high-density residential development by Tower Builders, located at 79-81 Wharf Street, Tweed Heads NSW. Positioned along the Tweed River foreshore, the development offers residents a premium coastal lifestyle within one of the Northern Rivers region’s most sought-after waterfront addresses, requiring building infrastructure that performs reliably and integrates seamlessly into daily building operations.
Elephants Foot Chute Solutions supplied and installed a waste chute system tailored to the building’s vertical layout and occupancy requirements. The system provides efficient waste transfer across multiple levels, reducing manual handling for building management and supporting well-organised waste room operations throughout the development.
The installation services eight chute pipe levels spanning levels 2 through 9, with eight fire-rated self-closing waste intake doors installed at each operational level. The chute runs straight up and down throughout the shaft, with the discharge room located at ground level.
A Type A bottom discharge door was installed at ground level, configured to suit a 1,100L MGB, providing a reliable and low-maintenance discharge solution at bin level. The discharge configuration supports clean and efficient waste collection, minimising handling requirements for facilities staff and keeping the ground level waste room well-organised.
A vent and wash-down cleaning system was installed at level 9, discharging through to roof level above to support airflow management, odour control, and internal chute hygiene throughout the full height of the shaft.
The completed installation provides Tower Builders with a durable and compliant waste infrastructure solution suited to the scale and character of Ultima on Wharf, delivering reliable long-term performance within a high-density waterfront residential environment.
1x Waste Chute System (Levels 2-9); 8x 510mm Galvanised Steel Chute Pipes; 8x Fire-Rated Self-Closing Waste Intake Doors; 1x Type A Bottom Discharge Door to suit 1,100L MGB; 1x Vent and Wash-Down Cleaning System; Ground Level Discharge Configuration.