SOL

Coolangatta, QLD

Delivered by

Client

Location

Coolangatta, QLD

Waste Chute System Installation

SOL is a luxury residential development by Rawcorp, located at 133-135 Musgrave Street, Coolangatta QLD, in the Kirra Beach precinct on Queensland’s southern Gold Coast. The development’s premium coastal setting and multi-level configuration required a practical and compliant waste management solution capable of servicing the full height of the building efficiently and reliably.

Elephants Foot Chute Solutions was engaged to supply and install a waste chute system tailored to the building’s vertical layout and occupancy requirements. The system provides efficient waste transfer across 10 chute pipe levels, with 10 fire-rated self-closing waste intake doors installed across all operational levels. Signage was fitted to each intake door to support correct use by residents throughout the building. The chute runs straight up and down throughout the shaft, with the discharge room located at basement level.

A Type A bottom discharge door was installed at basement level, configured to suit the selected MGB, providing a reliable and low-maintenance discharge solution at bin level. The discharge configuration supports clean and efficient waste collection and keeps the basement waste room well-organised for building management.

A vent and wash-down cleaning system was installed at the top of the chute shaft, discharging through to open air on the level above to support airflow management, odour control, and internal chute hygiene throughout the full height of the shaft.

The completed installation provides Rawcorp with a durable and compliant waste infrastructure solution suited to the scale and character of SOL, supporting reliable long-term performance and efficient building operations within the Kirra Beach precinct on Queensland’s southern Gold Coast.

System Supplied

1x Waste Chute System (10 Chute Pipe Levels, 510mm Galvanised Steel); 10x Fire-Rated Self-Closing Waste Intake Doors; 1x Type A Bottom Discharge Door to suit Selected MGB; 1x Vent and Wash-Down Cleaning System; Basement Level Discharge Configuration.

Key Outcomes

  • Waste chute system installed across 10 chute pipe levels within a luxury residential development in the Kirra Beach precinct
  • 10 fire-rated self-closing waste intake doors installed across all operational levels
  • Type A bottom discharge door installed at basement level to suit selected MGB
  • Vent and wash-down system installed at the top of the shaft to support odour control and chute hygiene
  • System supports efficient and low-maintenance waste handling for residents and building management
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026