Lismore City Hall

Lismore, NSW

Delivered by

Client

Location

Lismore, NSW

Waste Chute System Installation

Lismore City Hall is a heritage civic and cultural venue by Bennett Constructions, located at 1 Bounty Street, Lismore NSW, in the heart of the Northern Rivers region. The venue’s heritage significance and high-use public environment required a practical and compliant waste management solution that integrates sensitively into the building’s operational infrastructure.

Elephants Foot Chute Solutions supplied and installed a waste chute system servicing one chute pipe level, with one fire-rated self-closing waste intake door installed at the operational level. The discharge room is located at ground level, fitted with a minor offset discharge configuration to suit the selected bin size. Embelton NRD isolation mounts were installed to ceiling-mounted discharge room equipment to meet the acoustic specification of the heritage venue environment.

A pre-commencement site inspection was carried out prior to installation to confirm site conditions, and an odour relief vent and flushing spray system was installed at the top of the shaft to support airflow management and internal chute hygiene. The completed installation provides Bennett Constructions with a compliant and low-maintenance waste solution suited to the operational demands of one of the Northern Rivers region’s most significant civic buildings.

System Supplied

1x Waste Chute System (1 Chute Pipe Level, 510mm Galvanised Steel); 1x Fire-Rated Self-Closing Waste Intake Door; 1x Minor Offset Discharge Configuration; Embelton NRD Isolation Mounts to Discharge Room Equipment; 1x Odour Relief Vent and Flushing Spray System; Ground Level Discharge Configuration.

Key Outcomes

  • Waste chute system installed within a heritage civic and cultural venue in the Northern Rivers region
  • Minor offset discharge configuration installed at ground level with Embelton NRD isolation mounts to meet acoustic specification
  • Pre-commencement site inspection completed prior to installation
  • Odour relief vent and flushing spray system installed to support chute hygiene
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026