Arbor Park Sydney

Erskineville, NSW

Delivered by

Client

Location

Erskineville, NSW

Waste Chute System Installation

Arbor Park Sydney is a high-density residential development by Alliance Project Group, located at 57 Ashmore Street, Erskineville NSW, approximately 4km from the Sydney CBD. The four-core configuration required individually designed waste chute systems to suit the varying heights and layout constraints of each lift, including bespoke hopper fabrications and chute offsets to address site-specific installation conditions.

Elephants Foot Chute Solutions supplied and installed four waste chute systems across Lifts 1 through 4, providing a combined total of 27 chute pipe levels and 27 fire-rated self-closing waste intake doors at every operational level. A custom extended hopper and hopper door extensions were designed, manufactured, and installed at lower levels to address wall conditions that did not conform to standard installation requirements.

Lifts 1 and 2 incorporate chute offsets to route the chutes to their respective discharge rooms at basement 1, each fitted with a Type A bottom discharge door to suit a 1,100L waste MGB. Lifts 3 and 4 run straight up and down, each fitted with a linear track system without compactor to suit a 1,100L waste MGB. A 240L bin lifter was also installed in the recycling room at basement 1 to decant recycling into a 1,100L MGB, and vent and wash-down systems were installed at the top of all four shafts.

System Supplied

4x Waste Chute Systems (27 Chute Pipe Levels, 510mm Galvanised Steel); 27x Fire-Rated Self-Closing Waste Intake Doors; Custom Extended Hopper and Door Extensions; 3x Chute Offsets (Lifts 1 and 2); 2x Type A Discharge Doors and 2x Linear Track Systems to suit 1,100L MGB; 1x 240L Bin Lifter; 4x Vent and Wash-Down Cleaning Systems; Basement 1 Discharge Configuration.

Key Outcomes

  • Four waste chute systems installed across four lift cores with custom hopper fabrications to address non-conforming site conditions
  • Type A discharge doors in Lifts 1 and 2 and linear track systems in Lifts 3 and 4 installed at basement 1
  • 240L bin lifter installed in the recycling room to support efficient recycling collection
  • Vent and wash-down systems installed at the top of all four chute shafts
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026