Wee Hur Y Suites

Redfern, NSW

Delivered by

Client

Location

Redfern, NSW

Wee Hur Y Suites Smart Dual Waste & Recycling Chute System

Wee Hur Y Suites is a high‑occupancy purpose‑built student accommodation development delivered by Richard Crookes Construction within Sydney’s inner‑city education precinct. Located close to major universities, transport corridors, and employment hubs, the project required a high‑capacity waste handling solution capable of supporting continuous daily use while maintaining operational efficiency, hygiene, and regulatory compliance.

To meet these requirements, Elephants Foot Chute Solutions supplied and installed a high‑performance dual residential waste chute system incorporating integrated smart chute control technology. The installation includes durable 610mm galvanised steel chute pipes servicing Levels 2 through 18, providing reliable and efficient vertical waste and recycling transfer across the building’s residential floors.

Each level is equipped with fire‑rated, self‑closing interlocking waste and recycling chute intake doors fitted with smoke seals, supporting building fire safety compliance while ensuring secure and controlled system operation. The integrated smart chute HMI system with SMS functionality enables monitoring and controlled operation of hopper access, helping manage high‑traffic usage typical of student accommodation environments and reducing the risk of misuse or system overload.

At the uppermost levels, dedicated vent and wash‑down cleaning systems support airflow management, odour control, and chute hygiene, ensuring consistent performance even under high daily usage. At ground level, waste and recycling streams discharge to dedicated handling equipment, including a linear compactor system for waste and a linear track system for recycling, designed to suit 1100L bins and streamline servicing logistics. Together, the installation forms a critical component of the building’s broader student accommodation waste management infrastructure, delivering a robust, compliant, and future‑ready solution tailored to high‑density PBSA living.

System Supplied

Dual Waste and Recycling Chute System; 610mm Galvanised Steel Chute Pipes; Interlocking Fire‑Rated Intake Doors with Smoke Seals; Smart Chute HMI Control System with SMS; Linear Waste Compactor System; Linear Recycling Track System; Vent and Wash Down Cleaning Systems; Chute Signage

Key Outcomes

  • Smart chute control system supports safe high‑volume operation
  • Dual chute design enables efficient waste and recycling separation
  • Interlocking fire‑rated doors improve operational safety and compliance
  • Large‑diameter steel chutes support high‑capacity PBSA usage
  • Compactor and track systems improve bin handling efficiency
  • Integrated vent and wash‑down systems maintain hygiene and odour control
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026