
Elephants Foot Chute Solutions partnered with Hutchinson Builders to deliver a comprehensive multi-stage dual waste and recycling chute system for Whitton Lane – Bondi Junction, a premium mixed-use development comprising 122 residential apartments above three retail spaces.
Across multiple stages, Elephants Foot Chute Solutions provided: dual chute installations for separate lobbies, electronic two-hour fire-rated chute doors, eDiverter® Chute System to separate waste and recycling efficiently, linear compactor and track systems, and flushing spray cleaning systems for hygiene. Each system was designed with safety, efficiency, and minimal footprint in mind, including PLC-controlled diverters and self-closing electronic lockout doors for streamlined operation.
The installation ensures residents and building management benefit from a discreet, reliable, and high-performance waste management solution, backed by comprehensive warranties and ongoing operational guidance.
Dual waste and recycling chute systems; Electronic fire-rated chute doors; eDiverter® Chute System; Linear compactor system; Linear track system