Stage 2, 23 Pittwin Road North

Capalaba, QLD

Delivered by

Location

Capalaba, QLD

Waste Chute System Installation

Stage 2 is a low-rise residential development by Sukkar Property Developments, located at 23 Pittwin Road North, Capalaba QLD, within Brisbane’s south-east corridor. The development provides medium-density residential accommodation within an established suburban setting, requiring a practical and compliant waste management solution suited to the scale and layout of the building.

Elephants Foot Chute Solutions was engaged to supply and install a waste chute system tailored to the building’s layout and occupancy requirements. The system provides efficient waste transfer across multiple levels, reducing manual handling for building management and supporting well-organised waste room operations throughout the development.

The installation services four chute pipe levels, with four fire-rated self-closing waste intake doors installed at each operational level. A chute offset was incorporated at ground level to route the chute to the discharge room, with the discharge room located at ground level.

A Type A bottom discharge door was installed at ground level, configured to suit the selected MGB, providing a reliable and straightforward discharge solution at bin level. The discharge configuration supports clean and efficient waste collection, minimising handling requirements for facilities staff and keeping the ground level waste room well-organised.

A vent and wash-down cleaning system was installed at the top of the chute shaft, discharging through to open air on the level above to support airflow management, odour control, and internal chute hygiene throughout the shaft.

The completed installation provides Sukkar Property Developments with a durable and compliant waste infrastructure solution suited to the scale and operational demands of Stage 2, delivering reliable long-term performance within a medium-density residential environment in Brisbane’s south-east corridor.

System Supplied

1x Waste Chute System; 4x 510mm Galvanised Steel Chute Pipes; 4x Fire-Rated Self-Closing Waste Intake Doors; 1x Chute Offset at Ground Level; 1x Type A Bottom Discharge Door to suit Selected MGB; 1x Vent and Wash-Down Cleaning System; Ground Level Discharge Configuration.

Key Outcomes

  • Waste chute system installed across four chute pipe levels within a low-rise residential development
  • Four fire-rated self-closing waste intake doors installed across all operational levels
  • Chute offset incorporated at ground level to suit building layout and discharge room configuration
  • Type A bottom discharge door installed at ground level to suit selected MGB
  • Vent and wash-down system installed at the top of the shaft to support odour control and chute hygiene
  • Ground level discharge configuration supports efficient and organised waste room operations
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026