The Hoxton

6 Gillespie Street, Liverpool NSW

Delivered by

Client

Location

6 Gillespie Street, Liverpool NSW

Elephants Foot Chute Solutions Installs Waste Chute Systems for The Hoxton Residential Development in Liverpool

Elephants Foot Chute Solutions partnered with ALAND to deliver a large-scale waste management solution for The Hoxton, a three-building mixed used development in Liverpool designed by DWA Architects. Comprising over 300 apartments with rooftop gardens and premium finishes, the project required a robust, multi-building waste chute system to support daily operations for residents.

In Building A, a 33-level waste chute system was installed, incorporating 31 fire-rated, self-closing Chute Doors with signage. Two bypass levels were included on the lower floors. At the rooftop, a vent and wash-down cleaning system was fitted, while the basement discharge room was equipped with a Carousel Bin System designed to manage four 660L MGBs.

Building B was fitted with an eight-level chute system, including seven intake doors and signage, with a bypass at ground level. The discharge room housed a Linear Track Bin System configured for two 660L MGBs, along with a 240L bin lifter to decant smaller bins into larger recycling MGBs.

Building C also received an eight-level chute system, featuring six intake doors and signage with bypasses at ground and first levels. The discharge room was fitted with a second Linear Track Bin System for two 660L MGBs, supported by a rooftop vent and wash-down system.

Across all three buildings, the chute systems were designed as straight vertical runs, ensuring long-term durability and reduced maintenance while meeting fire and building compliance standards.

System Supplied

Waste Chute Systems; Galvanised Steel Chute Pipes; Fire-Rated Chute Doors with Signage; Ventilation and Wash-Down Cleaning Systems; Carousel Bin System; Linear Track Bin Systems; 240L Bin Lifter

Key Outcomes

  • 49-level waste chute system spanning three residential towers
  • 44 fire-rated, self-closing Chute Doors with compliant signage
  • Three rooftop vent and wash-down systems ensuring hygiene and odour control
  • Carousel Bin System installed for Building A managing 4 x 660L MGBs
  • Two Linear Track Bin Systems installed in Buildings B and C managing 2 x 660L MGBs each
  • 240L Bin Lifter provided for efficient recycling management
  • Straight vertical chute runs providing reliability and reduced maintenance requirements
  • Full compliance with NSW high-rise residential fire safety and building standards
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026