Elephants Foot Chute Solutions Installs Dual and Single Chute Systems for The Crescent Mixed-Use Development in Fairfield

Elephants Foot Chute Solutions worked with Hogar Construction to deliver advanced waste infrastructure for The Crescent, a mixed-use development in Fairfield comprising over 100 luxury apartments and six ground-floor commercial spaces. Designed by Architecture Design Studio, the project required a combination of dual and single chute systems to support its high-density residential design.

In Building A – Core 1, a Dual Chute System was installed across 12 levels, featuring 24 galvanised steel chute pipes, 12 fire-rated Chute Doors for waste, and 12 fire-rated chute doors for recycling. Two rooftop odour management systems with vents and flushing sprays were installed, with the ground-level discharge room fitted with medium-offset Discharge Attachments configured for 1100L MGBs for both waste and recycling streams.

In Building B – Core 2 and Core 3, two independent waste chute systems were installed, each spanning eight levels with eight fire-rated chute doors. Rooftop odour relief vents and flushing sprays were fitted at level 8, with ground-level discharge rooms incorporating minor-offset discharge units configured for 1100L MGBs.

A key variation to the project included the installation of custom chute offsets and linear track systems. These included a custom recycling bypass from ground to upper basement in Building A and Linear Track Bin Systems across multiple cores, designed to manage 660L MGBs for both waste and recycling streams.

This tailored installation ensured The Crescent received a robust and scalable waste management solution, integrating dual-stream recycling and general waste handling with modern discharge technology.

System Supplied

Dual Chute System; Waste Chute Systems; Galvanised Steel Chute Pipes; Fire-Rated Chute Doors; Odour Management; Linear Track Bin Systems; Discharge Attachments

Key Outcomes

  • Dual chute system installed in Building A with waste and recycling streams
  • Two single chute systems installed in Building B cores, each spanning eight levels
  • 40 fire-rated, self-closing chute doors with compliant signage
  • Rooftop odour relief vents and flushing spray systems across four cores
  • Custom chute offsets and bypass designed to accommodate basement integration
  • Linear track systems supporting 660L MGBs for both waste and recycling streams
  • Discharge Attachments configured with medium and minor offsets for 1100L MGBs
  • Full compliance with NSW mixed-use building fire and safety standards
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026