Scape Kensington

Kensington, NSW

Delivered by

Client

Location

Kensington, NSW

Scape Kensington Waste, Recycling & Food Waste Chute Systems

Scape Kensington is a purpose‑built student accommodation development delivered by Infinity Constructions Group within Sydney’s university and education precinct. Designed to support high‑occupancy living, the building required a robust and compliant waste management solution capable of handling continuous daily use across multiple waste streams.

To meet these requirements, Elephants Foot Chute Solutions supplied and installed a comprehensive suite of high‑capacity waste and recycling chute systems tailored specifically for student accommodation environments, where durability, hygiene, and operational efficiency are critical.

The primary installation comprises a large‑scale dual chute system constructed from 510mm galvanised steel chute pipes, servicing levels Ground through to Level 17. Separate waste and recycling risers provide clear stream separation, supporting improved recycling outcomes while reducing contamination and misuse in a high‑traffic residential setting.

Fire‑rated, self‑closing waste and recycling intake doors are installed across all active levels, complete with smoke seal upgrades to enhance fire and smoke compartmentation. Clear signage at each intake supports correct system use and safe resident interaction.

At basement level, waste handling is managed through a combination of linear compactor and linear track systems, allowing efficient servicing of high‑volume waste and recycling streams while minimising manual handling. Additional bin handling equipment, including powered tugs and universal bin hitches, further supports safe and efficient operations.

In addition to general waste and recycling, the project incorporates a dedicated food waste chute system constructed from custom 410mm galvanised steel chute pipes. This system includes lockable intake doors, odour neutralisation equipment, and a carousel discharge system, providing a controlled solution for organic waste management within a student accommodation environment.

Multiple vent and wash‑down cleaning systems are installed at the top of each chute riser, supporting odour control, hygiene, and long‑term system performance. The completed installation delivers a highly specialised student accommodation waste management solution designed to meet the demands of high‑density, high‑turnover residential use.

System Supplied

Dual Waste & Recycling Chute System; Food Waste Chute System; 510mm & 410mm Galvanised Steel Chute Pipes; Fire‑Rated Self‑Closing Intake Doors; Smoke Seal Door Upgrades; Linear Track Compactor System; Linear Track System (No Compactor); Carousel Food Waste System; Vent and Wash‑Down Cleaning Systems; Odour Neutralisation System; Bin Handling Equipment; Chute Signage

Key Outcomes

  • High‑capacity dual waste and recycling system servicing 18 levels
  • Dedicated food waste chute system improves organic waste control
  • Fire‑rated, smoke‑sealed intake doors enhance safety and compliance
  • Multiple discharge systems support efficient bin handling and servicing
  • Odour control and automated wash‑down improve hygiene outcomes
  • Purpose‑designed solution suited to high‑occupancy student accommodation
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026