
Elephants Foot Chute Solutions partnered with award-winning developer Billbergia to deliver a high-performance waste infrastructure solution for Stage 2 of Rhodes Central, encompassing the landmark Peake Tower and Oasis Tower at 34 Walker Street, Rhodes NSW. As part of a five-tower masterplanned precinct adjacent to Rhodes Rail Station, this stage includes 674 apartments across two high-rise buildings, with Peake Tower reaching 48 levels, now the tallest building in Rhodes.
To support the demands of high-density living, our team engineered and installed a complete dual chute system across 106 residential levels, integrating fire-rated hopper doors, roof-mounted ventilation and washdown systems, and linear bin track system.
Our team provided a full-service solution including fire-rated hopper doors, ventilation and washdown systems, and linear track systems.
This installation not only ensured compliance with fire and hygiene standards, but also significantly improved operational efficiency and safety in the waste handling process.
Dual Chute System; Fire-Rated Hopper Doors; Linear Track Systems; Ventilation & Wash Down System; Chute Offset & Bypass Configurations; Discharge Room Fit-Outs