Serenity

West Gosford, NSW

Delivered by

Location

West Gosford, NSW

Serenity West Gosford - Waste Chute System

Serenity is a multi residential development located in West Gosford on the NSW Central Coast. Delivered by BF Build, the project provides modern apartment living within a growing urban precinct designed to support efficient building operations, resident amenity, and long‑term asset performance.

Elephants Foot Chute Solutions supplied and installed a compliant 510mm galvanised steel waste chute system engineered to support efficient vertical waste transfer throughout the building. The installation services eight operational waste intake levels spanning Ground to Level 7, allowing residents to dispose of waste safely while improving waste management efficiency for building operators.

Each intake level is fitted with fire‑rated self‑closing hopper doors designed to meet Australian building standards and ensure safe daily operation. As part of the installation, intake doors were upgraded with medium‑temperature smoke seals to enhance fire safety performance within the building’s vertical service core.

The chute system runs vertically without additional transfers, ensuring consistent gravity waste flow and reducing long‑term maintenance requirements. An integrated vent and wash‑down cleaning system was installed at Level 7 to support airflow management, odour control, and ongoing hygiene within the chute shaft.

Waste collected through the chute discharges to the Basement 1 waste room where a minor offset connects to a splitter discharge system configured to suit 1100L MGB bins. This arrangement supports efficient waste distribution into collection bins while maintaining organised waste room operations for building management.

System Supplied

Single 510mm Galvanised Steel Waste Chute System (Levels G–7); Fire‑Rated Self‑Closing Intake Doors (8 Total); Intake Door Smoke Seal Upgrades (8 Total); Vent & Wash‑Down Cleaning System (1 Total); Minor Offset Discharge Arrangement; Splitter Discharge System to suit 1100L MGB; Basement Level Discharge Configuration.

Key Outcomes

  • Efficient vertical waste transfer across eight residential intake levels
  • Smoke seal upgrades improving fire safety compliance
  • Straight vertical chute configuration for reliable gravity waste flow
  • Integrated ventilation and wash‑down cleaning system for hygiene control
  • Splitter discharge system supporting efficient waste distribution into bins
  • Durable galvanised steel construction aligned with NSW compliance requirements
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026