Prana Apartments

Maroochydore, QLD

Delivered by

Client

Location

Maroochydore, QLD

Prana Apartments Waste Chute System

Prana Apartments is a medium‑density residential development delivered by Timit Building within the Maroochydore riverfront precinct. Located close to retail, transport links, and coastal amenities, the project required a reliable waste handling solution designed to support daily resident use while maintaining compliance, efficiency, and long‑term operational performance in a coastal environment.

To meet these requirements, Elephants Foot Chute Solutions supplied and installed a dedicated residential waste chute system designed for consistent vertical waste transfer across Levels 01 to 04. The system incorporates durable 510mm galvanised steel chute pipes, selected for strength, longevity, and suitability within multi‑residential construction.

Each level is fitted with fire‑rated, self‑closing waste chute intake doors, ensuring safe and compliant resident access while supporting building fire safety requirements. To enhance acoustic performance and minimise noise transfer between apartments, the chute system includes a 55mm foil‑faced glass‑wool acoustic lagging upgrade fixed to all chute sections—an important consideration in medium‑density living environments.

An integrated vent and wash‑down cleaning system is installed at Level 04, supporting airflow, odour control, and internal chute hygiene to maintain reliable daily operation. At Basement 01, waste discharges via a minor‑offset arrangement designed to suit operational bin handling requirements, ensuring practical servicing access while maintaining efficient waste flow.

Together, the installation forms part of the building’s broader apartment waste management infrastructure, delivering a compliant, durable, and low‑maintenance solution tailored to contemporary residential living in Maroochydore.

System Supplied

Waste Chute System; 510mm Galvanised Steel Chute Pipes; Fire‑Rated Self‑Closing Intake Doors; Acoustic Lagging Upgrade (55mm R1.3 Glass‑Wool); Vent and Wash Down Cleaning System; Minor Offset Discharge Arrangement

Key Outcomes

  • Durable galvanised steel chute construction supports long‑term performance
  • Acoustic lagging upgrade reduces noise transfer between apartments
  • Fire‑rated intake doors improve safety and compliance
  • Vent and wash‑down system enhances hygiene and odour control
  • Minor offset discharge supports practical basement bin handling
  • Well‑suited to medium‑density coastal apartment living
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026