Pienza Neutral Bay

Neutral Bay, NSW

Delivered by

Client

Location

Neutral Bay, NSW

Pienza Neutral Bay Waste Chute Systems

Pienza Neutral Bay is a medium‑density residential development delivered by Richard Crookes Construction on Sydney’s Lower North Shore. Located within an established village setting close to transport links and local services, the development required a reliable and compliant waste management solution capable of supporting daily residential use while minimising operational noise and disruption.

To meet these requirements, Elephants Foot Chute Solutions supplied and installed two independent waste chute systems, each servicing separate building cores. The systems were designed to deliver efficient vertical waste transfer while maintaining safety, hygiene, and long‑term building performance.

Both chutes incorporate 510mm galvanised steel chute pipes with a comprehensive acoustic lagging upgrade. The acoustic treatment consists of a high‑performance barrier bonded to convoluted foam, reducing noise transmission and improving resident comfort in a medium‑density residential environment.

Fire‑rated, self‑closing waste chute intake doors are installed on all active residential levels, providing safe and intuitive access while maintaining fire and smoke separation between floors. Clear signage at each intake supports correct use and helps minimise misuse.

At the top of each chute, dedicated vent and wash‑down cleaning systems provide continuous airflow and automated internal cleaning. These systems assist with odour control, improve hygiene, and help protect the internal condition of the chute over the life of the building.

At discharge level, waste is transferred via Type A bottom discharge units into 660L mobile garbage bins. This configuration integrates seamlessly with the building’s residential waste management system, allowing efficient servicing while reducing manual handling. The completed installation delivers a durable, acoustically controlled solution well suited to residential living on Sydney’s Lower North Shore.

System Supplied

Waste Chute Systems; 510mm Galvanised Steel Chute Pipes; Acoustic Lagging Upgrade; Fire‑Rated Self‑Closing Intake Doors; Type A Bottom Discharge Units; Vent and Wash‑Down Cleaning Systems; Chute Signage

Key Outcomes

  • Two independent waste chute systems servicing separate building cores
  • Acoustic lagging upgrade reduces noise transfer between floors
  • Fire‑rated intake doors improve safety and regulatory compliance
  • Type A discharge to 660L bins supports efficient waste collection
  • Automated wash‑down and venting improves hygiene and odour control
  • Reliable solution suited to medium‑density residential developments
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026