Llandaff Development

Bondi Junction, NSW

Delivered by

Client

Location

Bondi Junction, NSW

Llandaff Development Residential Waste Chute System

Llandaff Development is a medium‑density residential project delivered by Kuatro Build in Sydney’s eastern suburbs. Located in the highly serviced Bondi Junction precinct, the site sits close to transport, retail, and major employment hubs, requiring a practical and compliant waste management solution capable of supporting daily residential use while minimising noise and disruption.

To meet these requirements, Elephants Foot Chute Solutions supplied and installed a centralised waste chute system designed to deliver efficient vertical waste transfer while maintaining safety, hygiene, and long‑term operational performance.

The system incorporates 510mm galvanised steel chute pipes servicing nine levels from ground to Level 8. To reduce noise transmission within the residential environment, all chute sections were fitted with a high‑performance acoustic lagging upgrade consisting of 55mm, foil‑faced glass‑wool insulation, improving resident comfort and acoustic performance.

Fire‑rated, self‑closing waste chute intake doors are installed on every active level, providing safe and intuitive access while maintaining fire and smoke separation between floors. Clear signage supports correct resident use and reduces misuse.

At the top of the chute, a dedicated odour relief vent and wash‑down cleaning system provides continuous airflow and automated internal cleaning. This assists with odour control, improves hygiene, and protects the internal condition of the chute over the life of the building.

At basement level, waste is discharged via a Type A discharge system with a minor offset into a 240L mobile garbage bin. A linear compactor system is integrated at discharge level, reducing waste volume and improving collection efficiency. The completed installation integrates seamlessly with the building’s residential waste management system, delivering a reliable, low‑maintenance solution suited to medium‑density residential living in Bondi Junction.

System Supplied

Waste Chute System; 510mm Galvanised Steel Chute Pipes; Acoustic Lagging Upgrade; Fire‑Rated Self‑Closing Intake Doors; Type A Bottom Discharge with Minor Offset; Vent and Wash‑Down Cleaning System; Linear Compactor System to 240L MGB

Key Outcomes

  • Centralised waste chute servicing nine residential levels
  • Acoustic lagging upgrade reduces noise transfer between apartments
  • Fire‑rated intake doors improve safety and regulatory compliance
  • Linear compactor reduces waste volume and improves collection efficiency
  • Automated wash‑down and venting improves hygiene and odour control
  • Reliable solution suited to medium‑density residential developments
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026