
Elephants Foot Chute Solutions played a pivotal role in transforming waste and recycling management at One Sydney Harbour, a landmark development in Barangaroo, Sydney. Commissioned by Lendlease, one of the world’s leading property and infrastructure groups, our team delivered advanced, automated solutions across three key stages of the project.
In the first two stages, Elephants Foot designed and installed a dual chute system tailored to the significant demands of this high-rise development. Each 610mm chute was engineered to handle large waste volumes efficiently, while our automated Linear Track system streamlined the handling and compacting of full bins. This innovation eliminated manual handling, reduced labor requirements, and ensured a faster, safer, and more effective waste process.
For the third stage, Elephants Foot introduced its innovative eDiverter system, a proprietary solution that allows a single chute to manage both recycling and general waste. This intelligent diverter mechanism automatically segregates waste streams into the appropriate linear system, enhancing sustainability and reducing the need for multiple chutes. By minimising infrastructure costs and maximising operational efficiency, the eDiverter system demonstrates Elephants Foot’s dedication to innovation and sustainable practices in waste management.
Our work at One Sydney Harbour reinforces Elephants Foot’s reputation as a trusted partner in delivering sophisticated, future-ready waste management solutions. By combining innovative waste management technologies with a focus on efficiency, safety, and sustainability, we continue to set new benchmarks for waste handling in large-scale developments.
Dual Chute System (Stages 1 & 2), Linear Track System, eDiverter System (Stage 3)