High‑Capacity Linen Chute Infrastructure for Major Civic Events Facility

Nyaal Banyal Geelong Convention and Event Centre, delivered by Built on the Geelong waterfront, is a landmark civic and events infrastructure project designed to accommodate conferences, exhibitions, performances, and large‑scale public gatherings. As a high‑profile regional asset with significant visitor traffic, the facility required a robust and dependable linen management solution capable of supporting continuous back‑of‑house operations and fluctuating event demand.

Elephants Foot Chute Solutions supplied and installed a dedicated linen chute system comprising 510mm galvanised steel chute pipes servicing mezzanine and upper levels through to Level 11. The system provides efficient vertical transfer of linen from operational floors to the ground‑level discharge area, streamlining housekeeping processes and reducing manual handling requirements across the facility.

Fire‑rated, self‑closing linen intake doors were installed across designated levels to ensure compliant, safe operation within a high‑traffic commercial environment. An integrated odour relief vent and wash‑down cleaning system was incorporated at the uppermost level to support airflow performance, internal hygiene, and long‑term system reliability.

To meet acoustic performance expectations within a public events venue, all chute sections were upgraded with Thermotec Nuwrap 5 acoustic lagging. This treatment assists in reducing operational noise transmission between levels while maintaining overall building comfort standards.

At Ground Level, a medium offset discharge configuration was designed to suit a selected linen trolley arrangement, optimising back‑of‑house workflow and ensuring efficient collection and handling. The completed installation delivers a compliant, durable, and operationally efficient linen transfer solution tailored to the demands of a major civic events facility.

System Supplied

510mm Galvanised Steel Linen Chute System (Levels 00M–11); Fire‑Rated Self‑Closing Linen Intake Doors (10 Total); Acoustic Lagging Upgrade (Thermotec Nuwrap 5 – 12 Levels); Vent & Wash‑Down Cleaning System (Level 11); Medium Offset Discharge Arrangement to suit Linen Trolley; Ground Level Discharge Configuration.

Key Outcomes

  • High‑capacity vertical linen transfer across multiple levels
  • Acoustic performance upgrade to reduce operational noise
  • Compliant and fire‑rated intake access
  • Efficient ground‑level trolley handling configuration
  • Reliable back‑of‑house support for large‑scale event operations
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026