
Elephants Foot engineered and installed a 26-level vertical chute system for the second stage of Newmarket Randwick. The system featured galvanised steel pipes, fire-rated hoppers, venting and flushing for odour control, and compactors to streamline waste transfer. The result was a cleaner, more efficient, and space-saving solution.
Chute System; Fire-Rated Hopper Doors; Ventilation & Odour Control System; 4 Linear Compactor System