Newmarket Randwick – Primary Works Stage 2

Randwick, NSW

Delivered by

Client

Location

Randwick, NSW

Smart waste system integration for a growing high-density community precinct.

Elephants Foot engineered and installed a 26-level vertical chute system for the second stage of Newmarket Randwick. The system featured galvanised steel pipes, fire-rated hoppers, venting and flushing for odour control, and compactors to streamline waste transfer. The result was a cleaner, more efficient, and space-saving solution.

System Supplied

Chute System; Fire-Rated Hopper Doors; Ventilation & Odour Control System; 4 Linear Compactor System

Key Outcomes

  • Fire-rated self-closing hoppers improved safety and compliance
  • Ventilated chute system ensured odour control in residential complex
  • Reduced manual waste handling with integrated chute solution
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026