Shell Cove Hotel

Shell Cove, NSW

Delivered by

Client

Location

Shell Cove, NSW

Shell Cove Hotel – Integrated Waste, Recycling & Linen Chute Infrastructure

Shell Cove Hotel, delivered by Growthbuilt within the Shell Cove marina precinct, required a high‑performance waste management solution suited to the demands of hospitality operations. With food and beverage services, guest accommodation and high visitor traffic, the project called for a centralised system capable of managing multiple waste streams efficiently while maintaining hygiene, safety and compliance.

Elephants Foot Chute Solutions delivered an integrated solution comprising a dual waste and recycling chute system alongside a dedicated linen chute system. The installation included 26 vertical runs of 510mm galvanised steel chute pipework, configured to align with operational service levels and back‑of‑house planning requirements.

Fire‑rated, self‑closing waste chute intake doors were installed across nominated floors, with bypass arrangements incorporated where required to suit building layout and service coordination. All chute sections were upgraded with 25mm acoustic lagging (Thermotec Nuwrap 5) to minimise structure‑borne noise transfer — an important consideration within guest accommodation areas.

Integrated vent and wash‑down cleaning systems were installed to support airflow management, odour control and ongoing chute hygiene. At Basement Level 1, discharge configurations were arranged with minor offsets to suit 1100L MGB handling, including a linear compactor system for waste and a dedicated linear track system for recycling. The linen chute discharges independently to a selected trolley, ensuring operational separation between general waste and laundry streams.

The completed installation forms part of the hotel’s broader commercial waste management infrastructure, delivering a coordinated, acoustically treated and capacity‑optimised solution designed to support efficient day‑to‑day operations within a high‑traffic waterfront environment.

System Supplied

Dual Waste & Recycling Chute System; Dedicated Linen Chute System; 510mm Galvanised Steel Chute Pipes (26 Total); Fire‑Rated Self‑Closing Intake Doors; Bypass Levels (Selected Floors); Acoustic Lagging Upgrade (Thermotec Nuwrap 5); Vent & Wash‑Down Cleaning Systems; Minor Offset Discharge Configurations; Linear Compactor System (1100L MGB – Waste); Linear Track System (1100L MGB – Recycling); Separate Linen Discharge Arrangement

Key Outcomes

  • Dual waste and recycling streams for hospitality operations
  • Dedicated linen chute for accommodation support
  • 1100L compactor‑integrated waste handling
  • Full acoustic treatment across all chute sections
  • Vent and wash‑down hygiene integration
  • Designed for high‑traffic waterfront venue performance
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026