Delano, Crow’s Nest

Crows Nest, NSW

Delivered by

Client

Location

Crows Nest, NSW

Delano Crow’s Nest Waste Chute Systems

Delano is a high‑density residential development delivered by Ultra Building in Sydney’s Lower North Shore. Located within a major transport‑oriented and mixed‑use precinct, the project required a reliable and compliant waste management solution capable of supporting high daily resident volumes across multiple buildings.

To meet these requirements, Elephants Foot  Chute Solutions supplied and installed three independent residential waste chute systems, each designed to deliver safe, efficient vertical waste transfer while maintaining long‑term operational performance in a high‑use environment.

Each system incorporates 510mm galvanised steel chute pipes servicing Buildings A, B, and C. Fire‑rated, self‑closing waste chute intake doors are installed on all active levels, with smoke‑seal upgrades improving fire and smoke containment while enhancing acoustic performance between floors.

Dedicated vent and wash‑down cleaning systems are installed at the top of each chute run, supporting odour control, internal hygiene, and long‑term chute integrity. These systems reduce maintenance requirements and improve resident amenity within a high‑density setting.

At basement and podium levels, waste is discharged via compliant offset bottom discharge units into 660L mobile garbage bins. Medium and minor offset configurations were utilised to suit site‑specific discharge room constraints while maintaining safe and efficient servicing access.

The completed installation forms part of a broader residential waste management strategy tailored to high‑density apartment living, delivering a robust, compliant, and low‑maintenance solution that supports long‑term building performance.

System Supplied

Waste Chute Systems (3); 510mm Galvanised Steel Chute Pipes; Fire‑Rated Self‑Closing Intake Doors; Smoke Seal Door Upgrades; Vent and Wash‑Down Cleaning Systems; Medium and Minor Offset Discharge Units; Chute Signage

Key Outcomes

  • Three independent waste chute systems servicing multiple buildings
  • High‑capacity solution suited to high‑density residential living
  • Fire‑rated intake doors with smoke seals improve safety and compliance
  • Offset discharge configurations accommodate site‑specific constraints
  • Automated wash‑down and venting improves hygiene and odour control
  • Durable, low‑maintenance system supporting long‑term building operations
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026