Aveo Bella Vista Haven Stage 1B and 2

Bella Vista, NSW

Delivered by

Client

Location

Bella Vista, NSW

Aveo Bella Vista Haven – eDiverter Waste & Recycling Infrastructure

Aveo Bella Vista Haven Stage 1B and 2 is a retirement living development delivered by Growthbuilt within Sydney’s north‑west growth corridor. Designed to support independent and assisted living within a master‑planned community, the project required a safe, accessible and fully compliant waste management solution tailored to aged living environments.

To meet these requirements, Elephants Foot Chute Solutions supplied and installed a centralised eDiverter chute system servicing Ground through Level 10. The system comprises 11 vertical runs of 510mm galvanised steel chute pipes, providing controlled waste transfer while maintaining durability, fire compliance and long‑term reliability.

Each level is fitted with fire‑rated, self‑closing eDiverter intake doors, ensuring safe and user‑friendly resident access. A minor mid‑level offset at Ground level was engineered to suit structural coordination requirements while maintaining a predominantly straight vertical chute alignment through the upper floors.

An integrated vent and wash‑down cleaning system was installed at Level 10 to support airflow management, odour control and internal chute hygiene, critical considerations in retirement and healthcare‑focused environments.

At Basement Level 01, the discharge configuration includes a medium offset to the eDiverter stream feeding into structured 1100L MGB handling systems. The installation incorporates:

• A linear track system with compactor to suit 2 x 1100L MGB (waste)
• A linear track system to suit 2 x 1100L MGB (recycling)

This arrangement enhances bin capacity, reduces manual handling and improves servicing efficiency within the discharge room.

To further support resident comfort, the acoustic specification required Embelton NRD isolation mounts to ceiling‑mounted equipment within the discharge room, reducing vibration and structure‑borne noise transfer, an important feature in aged living environments where occupant wellbeing is paramount.

The completed installation forms part of the development’s broader apartment waste management infrastructure, delivering a safe, hygienic and operationally efficient solution tailored to retirement living.

System Supplied

eDiverter Chute System (11 Levels – Ground to Level 10); 510mm Galvanised Steel Chute Pipes; Fire‑Rated Self‑Closing eDiverter Intake Doors; Minor Mid‑Level Offset (Ground); Vent and Wash‑Down Cleaning System (Level 10); Medium Offset Discharge to 1100L MGB; Linear Track System with Compactor (2 x 1100L MGB – Waste); Linear Track System (2 x 1100L MGB – Recycling); Acoustic Isolation Mounts to Discharge Room Equipment

Key Outcomes

  • Centralised 11‑level waste and recycling transfer
  • Compactor‑integrated 1100L MGB handling
  • Acoustic vibration isolation in discharge room
  • Fire‑rated, compliant intake access at every level
  • Designed specifically for retirement living operations
  • Improved hygiene, safety and operational efficiency
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026