New Epping Stage 1 Residences

Epping, VIC

Delivered by

Client

Location

Epping, VIC

eDiverter Waste and Recycling Chute System Installation

New Epping Stage 1 Residences is a social and affordable housing development by Hacer Group, located at 215 Cooper Street, Epping VIC. The development’s three-block configuration required individually designed eDiverter chute systems with acoustic treatment to suit the building’s residential density and compliance requirements.

Elephants Foot Chute Solutions supplied and installed three eDiverter chute systems across Blocks A, B, and C, providing a combined total of 18 chute pipe levels and 18 fire-rated self-closing eDiverter intake doors installed at every operational level. The eDiverter system enables both waste and recycling streams to be managed through a single chute line, with an automated diverter at the base directing material to the correct bin. Acoustic lagging equivalent to Vibralag was applied to chute pipe sections across all three blocks to minimise noise transmission through the building structure.

Block A services six chute pipe levels, Block B services seven chute pipe levels, and Block C services five chute pipe levels. All three discharge rooms are located at level 00, each fitted with an eDiverter discharge system configured to suit 1,100L MGBs for both waste and recycling streams. Vent and wash-down cleaning systems were installed at the top of all three chute shafts, discharging through to roof level above to support airflow management, odour control, and internal chute hygiene.

The completed installation provides Hacer Group with a durable, compliant, and acoustically considered waste management solution suited to the operational demands of New Epping Stage 1 Residences, supporting efficient building operations within the first residential stage of one of Melbourne’s most significant master-planned precincts.

System Supplied

3x eDiverter Chute Systems (Blocks A, B and C, 18 Chute Pipe Levels, 510mm Galvanised Steel); 18x Fire-Rated Self-Closing eDiverter Intake Doors; Acoustic Lagging (Vibralag Equivalent, All Blocks); 3x eDiverter Discharge Systems to suit 1,100L MGB; 3x Vent and Wash-Down Cleaning Systems; Level 00 Discharge Configuration.

Key Outcomes

  • Three eDiverter chute systems installed across Blocks A, B, and C within the first residential stage of the New Epping master-planned precinct
  • Acoustic lagging applied to chute pipe sections across all three blocks to minimise noise transmission
  • eDiverter discharge systems installed at level 00 in all three blocks to suit 1,100L MGBs
  • Vent and wash-down systems installed at the top of all three chute shafts
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026