Bramston Terrace Apartments

Herston, QLD

Delivered by

Location

Herston, QLD

eDiverter Waste and Recycling Chute System Installation - Bramston Terrace Apartments, Herston QLD

Bramston Terrace Apartments is a multi-residential development by BPG Constructions, located at 51-53 Bramston Terrace and 7 Weightman Street, Herston QLD, within Brisbane’s inner-northern precinct approximately 2km from the CBD. Designed by Ellivo Architects with subtropical design principles prioritising natural light, airflow, and outdoor amenity, the development comprises 45 apartments across seven to eight storeys, offering a mix of two and three-bedroom residences.

Elephants Foot Chute Solutions supplied and installed an eDiverter chute system suited to the vertical layout and occupancy requirements of the building. The eDiverter system enables both waste and recycling streams to be managed through a single chute line, with an automated diverter at the base directing material to the correct bin, providing a space-efficient and practical waste separation solution for a mid-rise residential building.

The installation services eight chute pipe levels spanning ground floor, levels 1 through 6, and the pool deck level, with eight fire-rated self-closing eDiverter intake doors installed at each operational level. The discharge room is located at basement 1, with a medium offset discharge configuration installed to suit the eDiverter stream and a 1,100L bin.

A comprehensive acoustic upgrade package was applied throughout the installation to suit the subtropical residential environment and the building’s design intent. Acoustic lagging using a 25mm thick 5kg/m2 barrier bonded to convoluted foam was applied to all eight chute pipe sections, and NRD2 rubber isolation mounts with 10mm static deflection were installed at all eight chute levels to minimise structure-borne noise transmission through the building fabric. Together these treatments support a quiet and comfortable living environment for residents across all levels.

An odour relief vent and flushing spray system was installed at pool deck level, discharging through to open air at a maximum of 3,000mm above the head of the chute to support airflow management, odour control, and internal chute hygiene throughout the full height of the shaft. A reusable slab penetration ring former was also supplied to suit a 510mm chute through slabs up to 350mm thick, supporting accurate chute penetration installation within the building structure.

The completed installation provides BPG Constructions with a durable, compliant, and acoustically considered waste management solution tailored to the operational demands of Bramston Terrace Apartments, supporting efficient building operations and a comfortable residential environment throughout the development.

System Supplied

1x eDiverter Chute System (Ground Floor, Levels 1-6, and Pool Deck); 8x 510mm Galvanised Steel Chute Pipes; 8x Acoustic Lagging Upgrades (25mm 5kg/m2 Barrier with Convoluted Foam); 8x NRD2 Rubber Acoustic Isolation Mounts (10mm Static Deflection); 8x Fire-Rated Self-Closing eDiverter Intake Doors; 1x Medium Offset Discharge Configuration to suit 1,100L Bin; 1x Odour Relief Vent and Flushing Spray System; 1x Reusable Slab Penetration Ring Former (Supply Only); Basement 1 Discharge Configuration.

Key Outcomes

  • eDiverter chute system installed across eight levels including pool deck within a 45-apartment residential development
  • Eight fire-rated self-closing eDiverter intake doors installed from ground floor through to pool deck level
  • Single chute line manages both waste and recycling streams via automated diverter at basement 1
  • Acoustic lagging applied to all eight chute pipe sections to minimise airborne noise transmission
  • NRD2 rubber isolation mounts installed at all eight chute levels to reduce structure-borne noise
  • Medium offset discharge configuration installed at basement 1 to suit 1,100L bin
  • Odour relief vent and flushing spray system installed at pool deck level
  • Reusable slab penetration ring former supplied to suit 510mm chute through slabs up to 350mm thick
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026