Brady Hotel

Melbourne, VIC

Delivered by

Client

Location

Melbourne, VIC

Dual Waste, Recycling, Linen and Commercial Chute System Installation

Brady Hotel is a landmark mixed-use hotel and residential development by Brady Constructions, located at 380 Lonsdale Street, Melbourne VIC, in the geographic heart of the Melbourne CBD. The development’s complexity across four distinct building configurations required a coordinated waste infrastructure solution spanning residential, hotel, and commercial waste and linen streams within a single tower.

Elephants Foot Chute Solutions supplied and installed two dual waste and recycling chute systems across the north and south towers, a linen chute system servicing the hotel floors, and a separate commercial waste chute system, all constructed in 600mm galvanised steel. A combined total of 175 fire-rated self-closing stainless steel intake doors were installed across the waste and recycling systems, with bypass configurations and additional access panels incorporated across both towers throughout the shaft.

The north tower discharge room at ground level is fitted with a linear track system to suit a 1,100L MGB and a 25m3 portable compactor, with major offsets incorporated to route both chutes to the discharge room. The south tower, hotel linen, and commercial chute systems each discharge via Type A bottom discharge doors, with vent and wash-down cleaning systems installed at the top of all five chute shafts throughout the building.

The completed installation provides Brady Constructions with a durable, compliant, and comprehensively configured waste and linen infrastructure solution suited to the scale and complexity of Brady Hotel, supporting efficient building operations across a landmark mixed-use development in the heart of Melbourne’s CBD.

System Supplied

2x Dual Waste and Recycling Chute Systems (North and South Towers, 600mm Galvanised Steel); 1x Linen Chute System and 1x Commercial Waste Chute System; 175x Fire-Rated Self-Closing Stainless Steel Intake Doors; Linear Track System, 25m3 Portable Compactor and Major Offsets (North Tower); 4x Type A Bottom Discharge Doors; 5x Vent and Wash-Down Cleaning Systems.

Key Outcomes

  • Four chute systems installed across residential, hotel, and commercial configurations within a landmark Melbourne CBD tower
  • 175 fire-rated stainless steel intake doors with bypass configurations and access panels across both towers
  • Linear track and 25m3 portable compactor with major offsets installed in the north tower discharge room
  • Type A discharge doors installed across south tower, hotel linen, and commercial chute systems
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026