The Trentham Sandringham

Sandringham, VIC

Delivered by

Client

Location

Sandringham, VIC

The Trentham Sandringham Dual Waste and Recycling Chute System

The Trentham is a residential development delivered by Figurehead Construction in the bayside suburb of Sandringham. Located within an established residential area, the project required a compliant and reliable waste management solution that could support daily residential use while maintaining safety, hygiene, and long‑term performance.

To meet these requirements, Elephants Foot Chute Solutions supplied and installed a fully integrated dual waste and recycling chute system designed for medium‑density residential environments. The system incorporates 510mm galvanised steel chute pipes servicing ground level through to Level 4, providing smooth vertical waste transfer while reducing the risk of blockages and operational issues.

Separate fire rated, self‑closing intake doors are installed for both waste and recycling on each active level. This allows residents to correctly separate materials at the point of disposal while maintaining fire and smoke compartmentation in accordance with building compliance requirements. Clear separation of waste streams supports improved recycling outcomes and consistent system use.

At the top of the chute, odour relief venting and flushing spray systems provide airflow and automated internal chute cleaning, helping control odours, maintain hygiene, and protect long‑term system performance. At basement level, waste and recycling are discharged through minor offset discharge points, allowing efficient bin placement within the discharge room while minimising spatial impact.

The completed waste chute system provides a low‑maintenance, future‑ready solution that supports reliable daily operations and long‑term building value in a high quality bayside residential setting.

System Supplied

Dual Chute System; Waste Chute System; Recycling Chute System; 510mm Galvanised Steel Chute Pipes; Fire Rated Self‑Closing Intake Doors; Odour Relief Vent and Flushing Spray Systems; Minor Offset Discharge Systems

Key Outcomes

  • Dual waste and recycling chute system servicing five residential levels
  • Fire rated intake doors improve safety and compliance
  • Clear waste separation supports improved recycling outcomes
  • Odour control and wash down systems improve hygiene
  • Efficient basement discharge with minimal space impact
  • Reliable, low‑maintenance solution for bayside residential living
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026