
The Evelyn is a residential development delivered by Kappacon in Melbourne’s inner west, supporting medium‑density living within close proximity to transport, retail, and local services. To meet the operational demands of daily residential use while maintaining safety, compliance, and resident comfort, the project required a reliable and well‑engineered waste management solution.
Elephants Foot Chute Solutions supplied and installed a fully integrated dual waste and recycling chute system designed for multi‑level residential environments. The system incorporates 510mm galvanised steel chute pipes servicing Levels 1 through to Level 10, providing smooth vertical transfer and reducing the likelihood of blockages in a high‑use setting.
Fire rated, self‑closing intake doors are installed for both waste and recycling on every residential level, allowing clear separation of waste streams at the point of disposal while maintaining fire and smoke compartmentation in accordance with building requirements. Clear signage at each intake supports correct use and improved recycling outcomes across the building.
To enhance resident comfort, the chute system was upgraded with high‑performance acoustic lagging. A 25mm thick acoustic barrier bonded to convoluted foam was fixed directly to all chute sections, reducing noise transmission between levels and supporting a quieter residential environment.
At the top of each chute, vent and wash‑down cleaning systems provide airflow and automated internal cleaning to control odours, maintain hygiene, and protect long‑term system performance. At mezzanine level, waste and recycling are discharged through Type A bottom discharge units into 1100L mobile garbage bins, allowing efficient collection while minimising manual handling within the discharge room.
Reusable slab penetration ring formers were supplied to suit the 510mm chute, supporting accurate slab penetrations and improving installation efficiency during construction. The completed waste chute system delivers a low‑maintenance, future‑ready solution that improves recycling performance, reduces operational risk, and supports long‑term building performance.
Dual Chute System; Waste Chute System; Recycling Chute System; 510mm Galvanised Steel Chute Pipes; Fire Rated Self‑Closing Intake Doors; Type A Discharge Doors; Acoustic Lagging Upgrade; Vent and Wash Down Cleaning Systems; Reusable Slab Penetration Ring Formers