Pavilions

Nunawading, VIC

Delivered by

Client

Location

Nunawading, VIC

Dual Waste and Recycling Chute System Installation

Pavilions Blackburn Lake Stage 2 is an award-winning luxury retirement living development by Ironside, located at 131-173 Central Road, Nunawading VIC, set among protected woodland adjacent to Blackburn Lake in Melbourne’s eastern suburbs. The development’s premium character and multi-building configuration required a coordinated waste management solution with enhanced acoustic and hygiene specifications suited to the comfort and safety of its residents.

Elephants Foot Chute Solutions supplied and installed four dual waste and recycling chute systems across Blocks 4 South, 4 North, 5, and 6, providing a combined total of 24 chute pipe levels. All 24 fire-rated self-closing intake doors received medium temperature smoke seal upgrades, and acoustic lagging using a 25mm thick 5kg/m2 barrier bonded to convoluted foam was applied to chute pipe sections across all four blocks to minimise noise transmission within the retirement living environment.

Each block discharges to basement level, with two Type A bottom discharge doors installed per building – one configured to suit a 660L waste MGB and one to suit a 1,100L recycling MGB. An EF Neutralizer odour management unit was installed in each discharge room, and vent and wash-down cleaning systems were installed at the top of all eight chute shafts. Reusable slab penetration ring formers were supplied across all four blocks to support accurate chute penetration installation.

The completed installation provides Ironside with a durable, compliant, and acoustically considered waste infrastructure solution supporting efficient operations and a comfortable environment for residents across all four blocks.

System Supplied

4x Dual Waste and Recycling Chute Systems (24 Chute Pipe Levels, 510mm Galvanised Steel); 24x Fire-Rated Self-Closing Intake Doors with Smoke Seal Upgrades and Acoustic Lagging; 4x Type A Discharge Doors (660L Waste) and 4x Type A Discharge Doors (1,100L Recycling); 4x EF Neutralizer Odour Management Units; 8x Vent and Wash-Down Cleaning Systems; Basement Level Discharge Configuration.

Key Outcomes

  • Four dual waste and recycling chute systems installed across four building cores within a luxury retirement living development
  • All 24 intake doors upgraded with medium temperature smoke seals and acoustic lagging applied across all blocks
  • Type A bottom discharge doors installed for both streams in each block, with EF Neutralizer odour management in all discharge rooms
  • Vent and wash-down systems installed at the top of all eight chute shafts
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026