Merri Northcote - Dual Waste and Recycling Chute System Installation

Merri Northcote is a multi-residential development by Brady Constructions, located at 11 High Street, Northcote, in Melbourne’s inner north. Positioned within a vibrant and well-connected urban precinct, the development comprises six residential buildings of varying heights, each requiring an individually configured waste management solution to suit its specific layout and occupancy demands.

Elephants Foot Chute Solutions supplied and installed six dual waste and recycling chute systems across all six buildings, providing separate waste and recycling streams at every intake level. The systems enable efficient waste transfer across multiple levels, reduce manual handling for building management, and support well-organised waste room operations throughout the development.
The installation spans 64 chute pipe levels in total across all six buildings, with 32 fire-rated self-closing waste intake doors and 32 fire-rated self-closing recycling intake doors installed across all operational levels. All 64 intake doors were upgraded with medium temperature smoke seals, providing an additional layer of fire and smoke containment compliance throughout the development. Building 1 is the tallest core, servicing ground floor through to level 7 with discharge to basement 1. Buildings 2 and 4 discharge to basement 2, while Buildings 3, 5, and 6 discharge to basement 1.

Acoustic lagging using a 25mm thick 5kg/m2 barrier bonded to convoluted foam was applied to all 64 chute pipe sections across all six buildings, minimising noise transmission through the building structure and supporting a quieter residential environment for occupants throughout the development.

Minor offset discharge configurations were installed for both waste and recycling streams in Buildings 1, 2, 3, and 6, while medium offset discharge configurations were installed in Buildings 4 and 5, each configured to suit 1,100L MGBs. All discharge configurations are tailored to the specific waste room geometry of each building.

Odour relief vent and flushing spray systems were installed at the top of each chute shaft across all six buildings, discharging through to open air at a maximum of 3,000mm above the head of each chute to support airflow management, odour control, and internal chute hygiene. Six reusable slab penetration ring formers were also supplied to support accurate chute penetration installation throughout the development.

The completed installation provides Brady Constructions with a durable, compliant, and acoustically considered waste and recycling infrastructure solution tailored to the scale and configuration of Merri Northcote, supporting reliable long-term performance across all six residential buildings.

System Supplied

6x Dual Waste and Recycling Chute Systems (Buildings 1-6); 64x 510mm Galvanised Steel Chute Pipes; 64x Acoustic Lagging Upgrades (25mm 5kg/m2 Barrier with Convoluted Foam); 32x Fire-Rated Self-Closing Waste Intake Doors; 32x Fire-Rated Self-Closing Recycling Intake Doors; 64x Smoke Seal Intake Door Upgrades (Medium Temperature); 4x Minor Offset Discharge Configurations to suit 1,100L MGB (Waste and Recycling); 2x Medium Offset Discharge Configurations to suit 1,100L MGB (Waste and Recycling); 12x Odour Relief Vent and Flushing Spray Systems; 6x Reusable Slab Penetration Ring Formers (Supply Only).

Key Outcomes

  • Six dual waste and recycling chute systems installed across six residential buildings within a multi-building development
  • 64 chute pipe levels and 64 fire-rated self-closing intake doors installed across all buildings
  • All 64 intake doors upgraded with medium temperature smoke seals for enhanced fire and smoke compliance
  • Acoustic lagging applied to all 64 chute pipe sections to minimise noise transmission across the development
  • Minor offset discharge configurations installed in Buildings 1, 2, 3, and 6 to suit 1,100L MGBs
  • Medium offset discharge configurations installed in Buildings 4 and 5 to suit 1,100L MGBs
  • 12 odour relief vent and flushing spray systems installed across all six buildings
  • Six reusable slab penetration ring formers supplied to support accurate chute penetration installation
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026