
Little Hadriman Lofts is a medium‑density residential development delivered by Henny Construction within Melbourne’s inner north‑west urban renewal corridor. Located close to the CBD, major transport links, and employment precincts, the project required an efficient waste management solution capable of supporting daily resident usage while maintaining compliance, safety, and long‑term operational performance.
To meet these requirements, Elephants Foot Chute Solutions supplied and installed a dual residential waste management system providing separate waste and recycling streams for efficient vertical transfer throughout the building. The system supports improved recycling outcomes while simplifying servicing operations for building management teams.
The installation includes 510mm galvanised steel chute pipes servicing levels Ground through Level 4, designed for durability and consistent long‑term performance in residential environments. Fire‑rated, self‑closing waste and recycling chute doors are installed at each active intake level, ensuring safe, compliant, and user‑friendly access for residents while supporting building fire safety requirements.
Integrated vent and wash‑down cleaning systems are installed at the uppermost levels to assist with airflow management, odour control, and internal chute hygiene, helping maintain reliable system performance under daily operational use. At the discharge level, Type A bottom discharge units are configured to suit 1100L mobile garbage bins, ensuring efficient bin handling and streamlined waste collection operations. Together, these elements form a robust and dependable apartment waste chute solution designed to support the building’s long‑term operational efficiency.
Dual Waste and Recycling Chute System; 510mm Galvanised Steel Chute Pipes; Fire‑Rated Self‑Closing Intake Doors; Vent and Wash‑Down Cleaning Systems; Type A Bottom Discharge Units to suit 1100L MGB; Chute Signage