Burwood Brickworks Apartments Stages 5 and 6

Burwood East VIC

Delivered by

Client

Location

Burwood East VIC

Dual Waste and Recycling Chute System Installation

Burwood Brickworks Stages 5 and 6 are the final two residential buildings within the award-winning Burwood Brickworks master-planned precinct, constructed by Hacer Group for Frasers Property Australia and located at Foundation Boulevard, Burwood East VIC. The completion of these final stages required a dual waste and recycling chute system for each building, with smoke seal upgrades to all intake doors to suit the precinct’s compliance and building performance requirements.

Elephants Foot Chute Solutions supplied and installed two dual waste and recycling chute systems across Buildings 5 and 6, providing a combined total of 22 chute pipe levels and 22 fire-rated self-closing intake doors across all operational levels. All 22 intake doors received medium temperature smoke seal upgrades across both buildings. Building 5 services six waste and six recycling chute pipe levels, while Building 6 services five waste and five recycling chute pipe levels. Both buildings run straight up and down with discharge rooms located at ground level.

Each building is fitted with two Type A bottom discharge doors, one for the waste stream and one for the recycling stream, both configured to suit 1,100L MGBs. Vent and wash-down cleaning systems were installed at the top of all four chute shafts across both buildings, discharging through to roof level above to support airflow management, odour control, and internal chute hygiene.

The completed installation provides Hacer Group with a durable and compliant waste and recycling infrastructure solution suited to the scale and character of Burwood Brickworks Stages 5 and 6, delivering reliable long-term performance within one of Melbourne’s most recognised sustainable master-planned communities.

System Supplied

2x Dual Waste and Recycling Chute Systems (Buildings 5 and 6, 510mm LLDPE); 22x Fire-Rated Self-Closing Intake Doors with Smoke Seal Upgrades; 4x Type A Bottom Discharge Doors to suit 1,100L MGB; 4x Vent and Wash-Down Cleaning Systems; Ground Level Discharge Configuration.

Key Outcomes

  • Two dual waste and recycling chute systems installed across the final two buildings of the Burwood Brickworks master-planned precinct
  • All 22 intake doors upgraded with medium temperature smoke seals across both buildings
  • Type A bottom discharge doors installed for both waste and recycling streams at ground level in each building
  • Vent and wash-down systems installed at the top of all four chute shafts
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026