Auburn Square Stage 1

Auburn, NSW

Delivered by

Client

Location

Auburn, NSW

Auburn Square Stage 1 Waste and Recycling Chute System

Auburn Square Stage 1 is a major mixed use residential development delivered by Binah Constructions in Sydney’s western growth corridor. The project integrates high density residential apartments with retail and community uses, creating a precinct that generates large volumes of waste and recycling every day. To support these demands, Elephants Foot Chute Solutions designed and delivered a high capacity chute system that provides safe, compliant and efficient waste management across two separate building cores.

The installation consists of two independent dual waste and recycling chute systems constructed from 510mm galvanised steel. These chute risers provide smooth and reliable vertical transfer from all apartment levels to the ground floor discharge rooms, helping prevent blockages and improve daily waste flow in a high occupancy environment.

Each level is fitted with fire rated, self closing intake doors that allow residents to dispose of waste and recycling safely while maintaining fire compartmentation between floors. Integrated vent and wash down systems installed at the top of each chute provide airflow and automated internal cleaning, helping control odours, improve hygiene and protect long term system performance.

At ground level, waste is processed through high efficiency single bin compactor systems designed to suit 1100L mobile garbage bins. This reduces the number of bin movements required and increases storage capacity, which is critical for a large mixed use development. Recycling is discharged through Type A bottom discharge units, allowing clean and controlled transfer into 1100L bins for collection.

This fully integrated waste chute system and recycling solution delivers Auburn Square Stage 1 a robust, low maintenance and future ready platform for managing waste in a high density, mixed use environment.

System Supplied

Dual Chute Systems; Waste Chute System; Recycling Chute System; Galvanised Steel Chute Pipes; Fire Rated Intake Doors; Integrated Single Bin Compactors; Type A Discharge Doors; Vent and Wash Down Cleaning Systems

Key Outcomes

  • Dual chute systems supporting two high density building cores
  • Integrated compactors increase bin capacity and reduce collection frequency
  • Fire rated intake doors improve safety and building compliance
  • Reliable waste and recycling separation at every level
  • Improved hygiene and odour control through automated cleaning systems
  • Long term, low maintenance solution for a major mixed use precinct
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026