400A Duke Street

Sunshine North, VIC

Delivered by

Client

Location

Sunshine North, VIC

400A Duke Street Waste and Recycling Chute Systems

400A Duke Street is a medium‑density residential development delivered by Pace Building Co in Melbourne’s inner west growth area. Located within an established industrial‑to‑residential transition zone, the project required a practical and compliant waste management solution capable of supporting daily residential use while ensuring safety, hygiene, and long‑term building performance.

To meet these requirements, Elephants Foot Chute Solutions supplied and installed two independent dual waste and recycling chute systems, configured to service Building A and Building B. This approach provides consistent waste handling across the development while maintaining operational efficiency and regulatory compliance.

Both systems incorporate 510mm galvanised steel chute pipes with straight vertical runs and engineered minor offsets at discharge level to suit the building layout. The simplified chute configuration reduces blockages, supports smooth material flow, and assists with long‑term maintenance.

Fire‑rated, self‑closing waste and recycling chute intake doors are installed on all active levels, with upgraded smoke seals to improve fire and smoke separation performance. Clear signage at each intake supports correct resident use and helps minimise contamination between waste streams.

At the top of each chute, dedicated odour relief vent and wash‑down cleaning systems provide continuous airflow and automated internal cleaning. These systems improve hygiene, assist with odour control, and protect the internal condition of the chute over the life of the building.

At Level 01 discharge rooms, waste and recycling are transferred via Type A bottom discharge systems with minor offsets into 660L mobile garbage bins. Custom support brackets were incorporated to achieve compliant fixing and alignment. The completed installation integrates seamlessly with the building’s residential waste management system, delivering a reliable, low‑maintenance solution suited to medium‑density residential living in Melbourne’s inner west.

System Supplied

Dual Waste and Recycling Chute Systems; 510mm Galvanised Steel Chute Pipes; Fire‑Rated Self‑Closing Intake Doors; Smoke Seal Door Upgrades; Type A Bottom Discharge Units; Vent and Wash‑Down Cleaning Systems; Chute Signage; Custom Support Brackets

Key Outcomes

  • Two dual chute systems servicing separate residential buildings
  • Straight‑through chute design with minor offsets reduces blockages
  • Smoke‑sealed intake doors improve fire and smoke performance
  • Type A discharge to 660L bins supports efficient waste collection
  • Automated wash‑down and venting improves hygiene and odour control
  • Practical solution suited to medium‑density residential developments
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026