188 Grenfell Street, Adelaide SA

Adelaide, SA

Delivered by

Client

Location

Adelaide, SA

Dual Waste and Recycling Chute System Installation

188 Grenfell Street is a purpose-built student accommodation development by Synergy Construct Australia, located in the heart of the Adelaide CBD adjacent to the heritage-listed Crown and Anchor Hotel. Developed by Wee Hur Holdings and designed by Brown Falconer, the 29-storey tower delivers 645 student accommodation rooms within close proximity to the University of Adelaide and University of South Australia, requiring a high-capacity and compliant waste management solution suited to the demands of a large-scale student accommodation environment.

Elephants Foot Chute Solutions supplied and installed a dual waste and recycling chute system across 28 chute pipe levels, with 28 fire-rated self-closing waste intake doors and 28 recycling intake doors installed at every operational level. Eight custom chute support brackets were fabricated and installed across the lower levels to suit site-specific structural conditions, with levels above coordinated to standard Elephants Foot chute and penetration set-out detail throughout the remainder of the shaft. The discharge room is located at ground level.

The ground level discharge room is fitted with medium offset discharge configurations for both waste and recycling streams to suit 1,100L MGBs, a linear compactor system to suit a 1,100L waste MGB, and a linear system to suit a 1,100L recycling MGB. This combination of compaction and linear track equipment supports high-volume waste and recycling management suited to the occupancy demands of a 645-room student accommodation tower.

Odour relief vent and flushing spray systems were installed at the top of both chute shafts, discharging through to open air at a maximum of 3,000mm above the head of each chute to support airflow management, odour control, and internal chute hygiene throughout the full height of the building.

The completed installation provides Synergy Construct Australia with a durable, compliant, and high-capacity waste infrastructure solution tailored to the scale and operational demands of 188 Grenfell Street, supporting efficient building operations within one of Adelaide’s most significant student accommodation developments.

System Supplied

1x Dual Waste and Recycling Chute System (28 Chute Pipe Levels, 610mm Galvanised Steel); 56x Fire-Rated Self-Closing Intake Doors; 8x Custom Chute Support Brackets; 1x Linear Compactor and 1x Linear System to suit 1,100L MGB; 2x Odour Relief Vent and Flushing Spray Systems; Ground Level Discharge Configuration.

Key Outcomes

  • Dual waste and recycling chute system installed across 28 chute pipe levels within a 645-room student accommodation tower
  • 56 fire-rated self-closing intake doors installed across all levels with custom support brackets at lower levels
  • Linear compactor and linear system installed at ground level for both waste and recycling streams
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026