Cabra Vale Diggers Club

Canley Vale, NSW

Delivered by

Client

Location

Canley Vale, NSW

Cabra Vale Diggers Club Linen Chute System

Cabra Vale Diggers Club is a major hospitality and community venue redevelopment delivered by Wardan Group Constructions in Sydney’s south‑west. Designed to support high‑volume food service, entertainment operations, and daily patron activity, the facility required a reliable back‑of‑house waste and linen handling solution capable of maintaining operational efficiency, hygiene standards, and staff safety across multiple levels.

To meet these operational requirements, Elephants Foot Chute Solutions supplied and installed a dedicated commercial linen chute system designed to streamline the vertical transfer of used linen from operational floors to the basement discharge area. The system reduces manual handling, improves workflow efficiency for housekeeping and service teams, and supports consistent operational performance within a high‑traffic hospitality environment.

The installation includes 610mm galvanised steel chute pipes engineered for durability and long‑term reliability in commercial applications. Fire‑rated, self‑closing linen intake doors are installed across each operational level, providing secure and compliant access while ensuring safe day‑to‑day use by staff.

At the uppermost level, an integrated vent and wash‑down cleaning system supports airflow, odour management, and internal chute hygiene, helping maintain cleanliness and performance over time. Linen is discharged at basement level via a compliant bottom discharge arrangement designed to suit trolley handling requirements, forming part of the facility’s broader commercial waste and linen management infrastructure. Together, these elements provide a robust, low‑maintenance linen handling solution tailored to the operational demands of a high‑capacity hospitality venue.

System Supplied

Commercial Linen Chute System; 610mm Galvanised Steel Chute Pipes; Fire‑Rated Self‑Closing Linen Intake Doors; Type A Bottom Discharge Chute; Vent and Wash‑Down Cleaning System; Chute Signage

Key Outcomes

  • Improves back‑of‑house linen handling efficiency across multiple levels
  • Reduces manual handling requirements for housekeeping staff
  • Fire‑rated intake doors support compliance and operational safety
  • Vent and wash‑down system supports hygiene and chute cleanliness
  • Durable galvanised steel construction ensures long‑term reliability
  • Designed for high‑traffic hospitality and community facilities
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026