Château Castle Hill

16 Middleton Avenue, Castle Hill NSW

Delivered by

Client

Location

16 Middleton Avenue, Castle Hill NSW

Elephants Foot Consulting & Chute Solutions Deliver Integrated Waste Management System for Château Luxury Residential Precinct in Castle Hill

Elephants Foot Consulting and Elephants Foot Chute Solutions collaborated with Westbourne and Bridgestone Projects to deliver a fully integrated waste management strategy for Château, a premium residential development within Castle Hill’s emerging Showground Precinct. Featuring 290 luxury apartments and townhomes across four nine-storey buildings, the project required both a forward-looking Operational Waste Management Plan (OWMP) and a large-scale Waste Chute System.

The Operational Waste Management Plan, developed by Elephants Foot Consulting, outlined waste generation estimates, bin storage requirements, collection logistics, and recycling strategies. This ensured that the development would not only comply with council and regulatory requirements but also operate efficiently for residents and facility managers over the long term.

To bring the plan into action, Elephants Foot Chute Solutions supplied and installed six Dual Chute Systems constructed with 510mm galvanised steel pipes. Each chute was fitted with fire-rated, self-closing Chute Doors, with 108 intake doors installed and compliant signage provided.

At the rooftop of each building, ventilation and wash-down systems were integrated to maintain hygiene and odour control. In the basement discharge rooms, 12 Linear Track Bin Systems were configured for 1100L MGBs, accommodating both waste and recycling streams without compactors.

This combined consulting and chute solution provided Château with a future-proofed waste management system that was designed for high volumes, operational efficiency, and compliance with NSW multi-residential standards.

Services & Systems Supplied

Operational Waste Management Plan (OWMP); Dual Chute Systems; Galvanised Steel Chute Pipes; Fire-Rated Chute Doors with Compliant Signage; Ventilation and Wash-Down Cleaning Systems; Linear Track Bin Systems

Key Outcomes

  • Comprehensive OWMP ensuring long-term compliance and operational efficiency
  • Six dual chute systems installed across four luxury buildings
  • 120 chute pipe levels supporting waste streams
  • 108 fire-rated, self-closing chute doors with compliant signage
  • 12 rooftop vent and wash-down systems ensuring hygiene and odour control
  • 12 linear track bin systems configured for 1100L MGBs
  • Full compliance with NSW multi-residential building and fire safety standards
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026