Artisan East

Alphington, VIC

Delivered by

Location

Alphington, VIC

Artisan East - Triple Core Dual Waste & Recycling Chute Systems

Artisan East is a contemporary multi residential development located in the established suburb of Alphington in Melbourne’s inner north. Delivered by Ironside Constructions, the project required a reliable and compliant vertical waste management solution capable of servicing multiple cores while maintaining efficient waste room operations and resident amenity.

Elephants Foot Chute Solutions supplied and installed three independent dual 510mm galvanised steel waste chute systems across Lift A, Lift B and Lift C. The installation provides dedicated waste and recycling streams designed to support efficient vertical waste transfer throughout the building while maintaining compliance with Victorian building standards.

Across the development, a total of 20 operational waste and recycling intake levels were installed, distributed across the three cores servicing levels Ground to Level 3. Each intake level is fitted with fire‑rated hopper doors and signage to support safe and compliant waste disposal practices for residents.

The chute systems run vertically without offsets to optimise gravity flow and minimise long term maintenance requirements. Integrated vent and wash‑down cleaning systems were installed above the top service level for each chute to support airflow performance, odour management, and ongoing hygiene within the chute shaft.

All systems discharge to the Basement 1 waste room via Type A bottom discharge doors configured to suit 1100L MGBs for both waste and recycling streams. Plastic strip curtains were installed at the base discharge points to assist with containment and operational safety within the waste handling area.

The completed installation provides Ironside Constructions with a durable, compliant and low maintenance waste infrastructure solution tailored to the operational requirements of a multi core residential development, improving waste separation, reducing manual handling, and supporting long term building performance.

System Supplied

Three Dual 510mm Galvanised Steel Waste & Recycling Chute Systems (Levels G–3 Across 3 Cores – 20 Operational Waste & Recycling Intake Levels); Fire‑Rated Self‑Closing Intake Doors (20 Total); Vent & Wash‑Down Cleaning Systems (6 Total); Custom Chute Support Brackets (Ground Level – Lift A); Type A Bottom Discharge Doors to suit 1100L MGB (Waste & Recycling – 6 Total); Plastic Strip Curtains to Discharge Points (6 Total); Basement Level Discharge Configuration.

Key Outcomes

  • Multi core waste infrastructure supporting 20 operational waste and recycling intake levels
  • Dedicated waste and recycling streams to improve separation efficiency
  • Straight vertical chute runs for optimal gravity waste flow
  • Basement level discharge configuration suited to 1100L MGBs
  • Integrated ventilation and wash‑down cleaning systems for hygiene control
  • Durable galvanised steel construction aligned with Victorian compliance requirements
  • Reduced manual handling and improved waste room organisation
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026