Adelphi Apartments Glenelg

Glenelg North, SA

Delivered by

Client

Location

Glenelg North, SA

Dual Waste & eDiverter Chute System – Adelphi Apartments Glenelg

Adelphi Apartments Glenelg is a multi residential development positioned along the Glenelg North foreshore in South Australia. Designed to deliver contemporary coastal living within a premium waterfront setting, the building required a compliant and efficient waste management solution capable of supporting daily resident volumes while maintaining amenity and operational efficiency.

Elephants Foot Chute Solutions supplied and installed two dedicated 510mm galvanised steel vertical systems, comprising a standalone waste chute system for organic waste and an advanced eDiverter chute system for general waste and recycling separation. This dual-stream configuration enables residents to dispose of different waste types through purpose-designed intake doors while maintaining effective separation at discharge level.

The organic waste chute services all six levels and discharges via a Type A bottom discharge door to suit 660L MGBs. The second chute incorporates eDiverter technology, allowing controlled diversion of general waste and recycling into separate 1100L MGBs within the ground level discharge room. This arrangement optimises waste room layout, improves recycling outcomes, and reduces manual handling requirements for building management.

Each system includes fire-rated, self-closing intake doors to ensure compliance with relevant building regulations and occupant safety standards. Integrated vent and wash‑down cleaning systems were installed at the uppermost level of both chutes to support airflow performance, hygiene control, and long term operational reliability.

The completed installation provides a durable, low maintenance and code compliant waste infrastructure solution tailored to the building’s vertical design. By integrating organic waste separation alongside an eDiverter general waste and recycling stream, the system supports sustainable waste management practices while maintaining the premium standards expected in a coastal residential development.

System Supplied

Dual 510mm Galvanised Steel Organic & eDiverter Waste Chute Systems (Levels 1–6); Fire‑Rated Self‑Closing Intake Doors (12 Total); Vent & Wash‑Down Cleaning Systems (2 Total); Type A Bottom Discharge to suit 660L MGB (Organic); eDiverter Discharge System to suit 1100L MGBs (Waste & Recycling); Ground Level Discharge Configuration.

Key Outcomes

  • Dedicated organic waste and recycling separation within a single building
  • Improved recycling efficiency through eDiverter technology
  • Compliant fire-rated vertical waste transfer system
  • Optimised discharge room layout and bin handling
  • Durable solution suited to a premium coastal environment
  • Reduced manual handling and improved operational efficiency
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026