Riviere Apartments 

Kangaroo Point, QLD

Delivered by

Client

Location

Kangaroo Point, QLD

Riviere Apartments - eDiverter Waste & Recycling Chute System

Riviere Apartments is a premium residential development located in Kangaroo Point, one of Brisbane’s most prominent inner‑city precincts. Delivered by Aria Property Development Riviere, the project provides high‑quality apartment living with a strong focus on architectural design, resident amenity, and long‑term building performance.

Elephants Foot Chute Solutions supplied and installed a compliant 510mm galvanised steel eDiverter chute system designed to support efficient vertical waste management within the building. The system allows residents to dispose of both general waste and recycling through a single chute while automatically directing materials to the correct bin at discharge level.

The installation services 11 operational intake levels from Level 2 to Level 12, with Level 1 configured as a bypass level. Each service level is fitted with fire‑rated self‑closing intake doors designed to maintain safety compliance while supporting convenient resident waste disposal.

The chute runs vertically through the building without offsets, ensuring reliable gravity flow and reducing long‑term maintenance requirements. An integrated vent and wash‑down cleaning system was installed at the top service level to support airflow management, odour control, and internal hygiene within the chute shaft.

Waste and recycling streams are separated automatically through the eDiverter mechanism before discharging into 1100L MGB bins within the Ground level waste room. This configuration allows efficient bin management while supporting organised waste room operations for building management.

The completed installation provides Aria Property Development Riviere with a durable and compliant waste management solution tailored to a high‑density residential environment, improving recycling efficiency, reducing manual handling requirements, and ensuring reliable long‑term system performance.

System Supplied

510mm Galvanised Steel eDiverter Waste & Recycling Chute System (Levels 1–12); Fire‑Rated Self‑Closing eDiverter Intake Doors (11 Total); Vent & Wash‑Down Cleaning System (1 Total); eDiverter Discharge System to suit 1100L MGB; Ground Level Discharge Configuration.

Key Outcomes

  • Combined waste and recycling chute infrastructure using eDiverter technology
  • 11 operational intake levels servicing the residential tower
  • Straight vertical chute configuration for reliable gravity flow
  • Automated waste and recycling separation at discharge level
  • Integrated ventilation and wash‑down cleaning system for hygiene control
  • Durable galvanised steel construction aligned with Queensland compliance requirements
  • Improved waste room efficiency and reduced manual handling for building management
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026