Antara Living

Sydney Olympic Park, NSW

Delivered by

Client

Location

Sydney Olympic Park, NSW

Antara Living – High‑Rise Residential Waste Chute System

Antara Living is a medium to high‑density residential development delivered by Decode Sydney within the Sydney Olympic Park precinct. Positioned in a major mixed‑use corridor with strong transport connectivity, the project required a dependable and compliant waste management solution capable of servicing daily resident volumes across multiple levels while maintaining operational efficiency and long‑term performance.

To meet these requirements, Elephants Foot supplied Chute Solutions and installed a dedicated residential waste chute system servicing Building 2 from Level 00 through to Level 14. The system incorporates 15 vertical runs of durable 510mm galvanised steel chute pipes, engineered to provide consistent internal waste flow, structural integrity, and fire compliance within a high‑rise residential environment.

Each operational floor from Levels 01 to 14 is fitted with fire‑rated, self‑closing waste chute intake doors, ensuring safe and convenient resident access while maintaining compartmentation and building code compliance. A ground‑level bypass arrangement at Level 00 was incorporated to suit architectural planning and service coordination.

An integrated vent and wash‑down cleaning system was installed at Level 14, assisting with airflow management, odour control, and internal chute hygiene. This feature supports consistent system performance and is particularly important in transport‑connected urban developments where occupancy levels and waste volumes remain high.

At Basement Level 01, waste discharges through a medium offset configuration into a linear compactor system designed to suit two 660L MGBs. This arrangement improves bin capacity, reduces collection frequency, and enhances servicing efficiency within the basement discharge room.

Together, the installation forms part of a coordinated apartment waste management infrastructure, purpose‑built to support high‑rise living in Sydney Olympic Park while ensuring compliance, durability, and long‑term operational reliability.

System Supplied

Waste Chute System (Building 2); 510mm Galvanised Steel Chute Pipes (15 Levels); Fire‑Rated Self‑Closing Intake Doors (Levels 01–14); Bypass Level at 00; Vent and Wash‑Down Cleaning System; Medium Offset Discharge Arrangement; Linear Compactor System (2 x 660L MGB); Basement Level Discharge Configuration

Key Outcomes

  • High‑rise vertical waste transfer across 15 levels
  • 660L compactor‑ready discharge system
  • Integrated ventilation and wash‑down for odour management
  • Fire‑rated intake doors ensuring compliant resident access
  • Efficient basement servicing layout
  • Designed for long‑term durability in a high‑density urban precinct
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026