
The Huntly is a boutique mixed-use residential development by Balmain and Co, located at 421-439 Glen Huntly Road, Elsternwick VIC, within Melbourne’s City of Glen Eira. The development’s boutique scale and mixed-use character required a space-efficient and compliant waste management solution that integrates seamlessly into the building’s operational infrastructure across multiple levels.
Elephants Foot Chute Solutions was engaged to supply and install an eDiverter chute system tailored to the building’s vertical layout and occupancy requirements. The eDiverter system enables both waste and recycling streams to be managed through a single chute line, with an automated diverter at the base directing material to the correct bin, providing a practical and space-efficient waste separation solution well suited to a boutique mixed-use residential building.
The installation services seven chute pipe levels, with seven fire-rated self-closing eDiverter intake doors installed at every operational level. Signage was fitted to each intake door to support correct use by residents. The chute runs straight up and down throughout the shaft, with the discharge room located at ground level fitted with an eDiverter discharge system configured to suit a 660L MGB for both waste and recycling streams. An eDiverter control box suited to buildings up to 10 storeys was supplied, installed, and commissioned as part of the scope.
A vent and wash-down cleaning system was installed at the top of the chute shaft, discharging through to roof level above to support airflow management, odour control, and internal chute hygiene throughout the full height of the shaft.
The completed installation provides Balmain and Co with a durable, compliant, and low-maintenance waste management solution tailored to the boutique character of The Huntly, supporting efficient building operations and a refined residential experience for occupants within Melbourne’s City of Glen Eira.
1x eDiverter Chute System (7 Chute Pipe Levels, 510mm LLDPE); 7x Fire-Rated Self-Closing eDiverter Intake Doors; 1x eDiverter Discharge System to suit 660L MGB; 1x eDiverter Control Box (up to 10 Storeys, Supplied and Commissioned); 1x Vent and Wash-Down Cleaning System; Ground Level Discharge Configuration.