Blue

Milsons Point, NSW

Delivered by

Client

Location

Milsons Point, NSW

eDiverter Waste and Recycling Chute System Installation

Blue at Lavender Bay is an award-winning luxury residential development by Aqualand Construction, located at 61 Lavender Street, Milsons Point NSW, on Sydney’s Lower North Shore directly overlooking Sydney Harbour. The development’s premium harbourside setting and high-rise configuration required a space-efficient and compliant waste management solution with integrated compaction to support high-quality waste room operations at basement level.

Elephants Foot Chute Solutions supplied and installed an eDiverter chute system in 600mm galvanised steel across 20 chute pipe levels, with 20 fire-rated self-closing stainless steel eDiverter intake doors installed at every operational level. Bypass configurations were incorporated across three lower levels and one additional access panel was installed at basement 2 to support maintenance access. The chute runs straight up and down with no offsets, with the discharge room located at basement 3.

The basement 3 discharge room is fitted with an eDiverter discharge system configured to suit a single 1,100L recycling MGB and an integrated single bin compactor to suit a single 1,100L waste MGB, supporting efficient waste compaction and organised recycling collection within a high-density luxury residential environment. A vent and wash-down cleaning system was installed at the top of the shaft, discharging through to roof level above to support airflow management, odour control, and internal chute hygiene.

 

System Supplied

1x eDiverter Chute System (20 Chute Pipe Levels, 600mm Galvanised Steel); 20x Fire-Rated Self-Closing Stainless Steel eDiverter Intake Doors; 3x Bypass Configurations and 1x Additional Access Panel; 1x eDiverter Discharge System to suit 1,100L Recycling MGB; 1x Integrated Single Bin Compactor to suit 1,100L Waste MGB; 1x Vent and Wash-Down Cleaning System; Basement 3 Discharge Configuration.

Key Outcomes

  • eDiverter chute system installed across 20 chute pipe levels with bypass configurations at lower levels
  • 20 fire-rated stainless steel intake doors installed at every operational level
  • eDiverter discharge and integrated single bin compactor installed at basement 3 to suit 1,100L MGBs
  • Vent and wash-down system installed to support ongoing chute hygiene
Discover Our Projects

CONTACT

Have any questions?

We are here to help

Embrace the values of respect, diversity, and community by joining us in promoting a more sustainable and inclusive future through Elephants Foot’s dedication to the RAP Plan.
Since 1976 Elephants Foot has played a pivotal role in the waste and recycling services industry throughout Australia.

Subscribe to Newsletter

All Rights Reserved Elephants Foot 2026